This weekend was quite productive, started with loading the bike up and making a trip out to see Billywhizz. (Words cant express how much of a damn great guy Billywhizz is, top notch welder too, thanks mate)The trip was to get the turbo header modified to fit the bigger turbo, The header is for a slightly smaller turbo which meant that the turbo was about 15mm away from bolting straight up. we had to cut the Header flange off and resposition it slightly so we could get the turbo bolted up. I look at this as quite a large stepping stone in the project as before this the bike was really just a rebuilt motor with a bit of gofast goodies, it’s now that one step closer to getting fired up.
After I returned, work continued with the wiring and hope to get it finished this week. all the Electrics are just mocked in place with cable ties untill the new tail arrives and a new aluminium undertail can be measured up and sent off to the laser cutters to get cut. (in other words, ignore the cable ties)
Some brackets were made up to mount the two MSD coils, bit of an issue finding the right place to mount them while keeping it a short enough distance from the spark plugs and trying to keep it looking tidy, in the end i put them in front of the old ram air holes in the frame. I haven’t tried to fit the fairing but they look like they will be alright.
Anyway, here’s some progress pics.












